Client: Auckland Transport
Year: 2022
Description
The project involved the installation of a raised zebra crossing to slow down traffic in the vicinity of a primary school area. The scope of work included:
- Upgrading of nearby pram crossings to ensure safe passage for pedestrians when crossing the road.
- Installation of ACO drains to facilitate the continuous flow of water down the carriageway.
- The project was of significant size compared to other speed tables and was successfully completed by Victor (Foreman) and his crew.
Benefits
The expected project benefits included:
- Enhanced road safety, especially in the primary school area.
- Improved pedestrian crossings for safe passage.
- Efficient water drainage infrastructure.
Value of works
$300,000